Soru

Zorluk: ZorLiteral Comprehension and Fact Retrieval

Read the passage below carefully:

The Kainji Dam, located across the Niger River in Niger State, Nigeria, was constructed between 1964 and 1968 by the Italian consortium Impregilo. Designed to generate hydroelectric power, the dam created Kainji Lake, which covers an area of approximately 1,300 square kilometers. The power station was initially equipped with four generating turbines capable of producing a combined capacity of 320 megawatts, although design provisions allowed for a total of twelve turbines generating up to 960 megawatts. In addition to power generation, the dam was engineered to improve downstream navigation on the Niger River from Jebba to Niamey, while providing flood control for lower agricultural settlements.

Evaluate the following statement based on the text provided:
Upon its initial completion, the Kainji Dam power station operated with twelve generating turbines.

Cevap: Cevap

Cevap

The statement is False.
The statement is false because the text explicitly states that the power station was initially equipped with only four generating turbines. The mention of twelve turbines describes a design capability for potential expansion rather than the initial operational status.

Adım Adım Çözüm

1
Locate the explicit detail in the text regarding the number of turbines installed initially.
The text states: 'The power station was initially equipped with four generating turbines capable of producing a combined capacity of 320 megawatts, although design provisions allowed for a total of twelve turbines...'
Literal comprehension requires identifying facts directly stated without confusing initial figures with potential capacity.
2
Compare the statement's claim with the retrieved text evidence.
The statement claims twelve turbines were operational upon initial completion, but the text confirms only four turbines were initially equipped.
Differentiate between what was installed at launch versus what was planned as maximum capacity.

Anahtar Kavram

Literal comprehension of stated operational facts versus maximum potential design provisions
Bu soruyu puanla