A large-scale commercial footwear manufacturing factory in Aba operates a highly specialized assembly line utilizing division of labour. Arrange the following operational tasks in the correct chronological order from raw material intake to final product release for warehousing.
- 1Sorting, grading, and chemical conditioning of raw animal hides in the material preparation department
- 2Pattern cutting and upper leather clicking performed by specialized cutting operatives
- 3Lasting, stitching, and sole vulcanization at dedicated assembly-line workstations
- 4Edge trimming, surface buffing, and final quality assurance inspection by finishing specialists
- 5Individual boxing, container cartoning, and batch labeling by packaging and logistics personnel
Cevap
The correct chronological sequence of operations in the division of labour workflow is: 1) Sorting, grading, and chemical conditioning of raw hides; 2) Pattern cutting and upper leather clicking; 3) Lasting, stitching, and sole vulcanization; 4) Edge trimming, buffing, and quality inspection; 5) Boxing, cartoning, and batch labeling.
In an industrial production line governed by division of labour, tasks follow a strict technical sequence: raw material preparation comes first, followed by specialized component cutting, major structural assembly, cosmetic finishing with quality control, and finally protective commercial packaging.
Adım Adım Çözüm
Anahtar Kavram
Sequential Division of Labour in Industrial Manufacturing
Tahmini Süre:2m 30s