A systems administrator needs to deploy an urgent security patch to a critical application server during an upcoming maintenance window. To ensure the server can be restored to its previous operational state if the patch fails or destabilizes the environment, which component of the change management process must the administrator prepare?
- A rollback planAnswer
- BA scope of change document
- CA risk analysis report
- DAn end-user notification schedule
Answer
The administrator must prepare a rollback plan.
A rollback plan explicitly outlines the step-by-step technical procedures required to undo modifications and return systems to their previous baseline if a change causes instability or failure.
Step-by-Step Solution
Key Concept
Rollback Planning in Change Management