An IT operations analyst is drafting a formal change request to deploy a major software patch across enterprise endpoint devices. The submitted documentation outlines the business purpose, risk assessment, implementation schedule, and user communication plan. However, during initial review, the change manager notes that if the patch degrades system stability, there is no procedure defined to return the endpoints to a known good state. Which of the following components must be added to the request before submitting it for final Change Advisory Board (CAB) authorization?
- A documented backout strategy detailing system restoration stepsAnswer
- BA post-implementation verification checklist
- CA forensic chain of custody record
- DAn isolated sandbox baseline benchmark
Answer
The missing component that must be added prior to final CAB authorization is a documented backout strategy detailing system restoration steps.
A documented backout strategy (or rollback plan) is a mandatory requirement for formal change management proposals. It provides explicit instructions for undoing system modifications and restoring devices to their pre-change baseline state if severe issues or instability arise during implementation.
Step-by-Step Solution
Key Concept
Change Management Rollback and Backout Planning