Question

Difficulty: Very hardWork Rate and Combined Work

Three automated data-processing pipelines, AA, BB, and CC, process incoming dataset files at constant individual rates. Pipeline AA operating alone can complete a standard processing job in 1010 hours, while Pipeline BB operating alone can complete the same job in 1515 hours.

The processing begins with Pipelines AA and BB working together at their standard rates for 22 hours. At that point, Pipeline AA encounters a network slowdown that reduces its processing rate by 50%50\% for the remainder of the job. Pipelines AA and BB continue working at these modified rates for another 22 hours, after which Pipeline CC is brought online to assist them. If Pipeline CC operating alone at its constant rate could finish the entire job in 1010 hours, how many total hours from the start of the processing will it take for the job to be completed?

Answer: 6 hours

Answer

The total time required to complete the job is 6 hours.
To solve multi-stage work rate problems, determine the rate per unit of time for each participant, multiply by the duration of each operational phase, and track the remaining fraction of the job. In the first 2 hours, Pipelines AA and BB complete 13\frac{1}{3} of the job. In the next 2 hours with Pipeline AA at half speed (rate 120\frac{1}{20}), they complete an additional 730\frac{7}{30} of the job, leaving 1330\frac{13}{30} unfinished. When Pipeline CC (rate 110\frac{1}{10}) joins, the combined rate becomes 1360\frac{13}{60} per hour, taking exactly 2 more hours to complete the remaining 1330\frac{13}{30} of the job. Adding all three intervals (2+2+22 + 2 + 2) yields a total time of 6 hours.

Step-by-Step Solution

1
Determine the individual hourly work rates for each pipeline
Rate of Pipeline A=110A = \frac{1}{10} job/hr, Rate of Pipeline B=115B = \frac{1}{15} job/hr, Rate of Pipeline C=110C = \frac{1}{10} job/hr.
Work rate is the reciprocal of the total time taken to complete one full job.
2
Calculate work completed during Stage 1 (first 2 hours)
Combined rate = 110+115=16\frac{1}{10} + \frac{1}{15} = \frac{1}{6} job/hr. Work done = 2×16=132 \times \frac{1}{6} = \frac{1}{3} of the job.
Both Pipeline AA and Pipeline BB operate together at their standard rates for 2 hours.
3
Calculate work completed during Stage 2 (next 2 hours)
Modified rate of Pipeline A=0.50×110=120A = 0.50 \times \frac{1}{10} = \frac{1}{20} job/hr. Combined rate = 120+115=760\frac{1}{20} + \frac{1}{15} = \frac{7}{60} job/hr. Work done = 2×760=7302 \times \frac{7}{60} = \frac{7}{30} of the job.
Pipeline AA's efficiency drops by 50%, while Pipeline BB remains unchanged.
4
Calculate the remaining work after 4 hours
Total work completed = 13+730=1730\frac{1}{3} + \frac{7}{30} = \frac{17}{30}. Remaining work = 11730=13301 - \frac{17}{30} = \frac{13}{30}.
Subtracting cumulative work done from the total job (1) leaves the remaining portion.
5
Calculate the duration of Stage 3 when Pipeline CC joins
Combined rate = 120+115+110=1360\frac{1}{20} + \frac{1}{15} + \frac{1}{10} = \frac{13}{60} job/hr. Time required = 13/3013/60=2\frac{13/30}{13/60} = 2 hours.
Dividing remaining work by the combined rate of all three active pipelines gives the remaining time.
6
Sum the durations of all stages to find total elapsed time
Total time = 2 hours+2 hours+2 hours=6 hours2\text{ hours} + 2\text{ hours} + 2\text{ hours} = 6\text{ hours}.
The question asks for total elapsed time from the start of processing.

Key Concept

Multi-stage combined work rate problems require tracking accumulated work completed across distinct intervals with changing worker rates.