Hardware
445 soru
A technician is assembling a desktop workstation and has two matching 16 GB DDR4 memory modules. The motherboard contains four RAM slots labeled A1, A2, B1, and B2, representing memory Channel A and Channel B. To ensure the system operates in dual-channel mode as recommended by the motherboard documentation, which pair of slots should the technician populate?
A technician is sizing a power supply unit (PSU) for a dedicated video editing workstation. The workstation features the following components and estimated peak power requirements:
- Dual CPUs: TDP each
- Dual PCIe Graphics Cards: TDP each
- Motherboard, RAM, storage drives, and cooling fans combined:
To ensure optimal efficiency and headroom, the technician specifies that total peak system draw must not exceed of the power supply's continuous wattage rating. What is the minimum continuous power supply output rating, in Watts, needed for this system?
An IT technician is setting up a workspace with a modern laptop and a 4K external monitor. The technician connects the laptop's USB Type-C port to the monitor's USB Type-C input using a spare USB-C cable that came with a phone charger. Although the monitor detects a power connection, it shows a 'No Signal' message. Replacing the cable with a DisplayPort Alt Mode capable USB-C cable resolves the issue and displays video. Which of the following best explains why the original cable failed to transmit video?
A technician is installing a new M.2 PCIe NVMe solid-state drive onto a motherboard. After installing the drive into an available M.2 slot and powering on the system, the drive is not detected in the UEFI/BIOS configuration. Documentation for the motherboard reveals that the specific M.2 slot utilized is keyed strictly as a B-key slot supporting SATA protocol only. Which of the following best explains why the drive is not recognized by the motherboard?
A technician is preparing to install two additional memory modules into a standard desktop workstation motherboard that features four RAM slots and supports dual-channel DDR4 architecture. Which TWO of the following physical characteristics or installation rules must the technician follow to ensure proper dual-channel performance and hardware compatibility?
Geçerli olan tümünü seçin
An IT support technician needs to perform preventive maintenance on a thermal transfer label printer that is producing faint lines and streaks across printed shipping barcodes. Arrange the maintenance tasks in the correct sequential order from start to finish.
Öğeleri doğru sıraya koymak için sürükleyin
A technician is installing a PCIe x4 RAID controller expansion card rated at TDP into a desktop workstation. The card has no external auxiliary power connectors on its PCB. The motherboard features an available physical PCIe x16 slot (wired electrically at x4) and several PCIe x1 slots. Which of the following is the most appropriate installation approach to ensure the card operates correctly?
A digital artist reports that after upgrading to a high-end monitor capable of 4K resolution at a 144 Hz refresh rate, the display caps out at 1080p resolution and occasionally flickers. Upon inspection, the technician discovers the monitor is connected using a standard single-link DVI cable through a passive DVI-to-HDMI adapter into an older legacy video port on the workstation. Which TWO of the following solutions should the technician implement to enable full 4K resolution at 144 Hz? (Select TWO.)
Geçerli olan tümünü seçin
A technician is installing a replacement motherboard into a desktop tower and connecting the chassis front panel cabling to the system board headers. Which of the following statements accurately describe the installation requirements and operational characteristics of motherboard front panel headers? (Select TWO.)
Geçerli olan tümünü seçin
A field service technician is servicing a compact all-in-one ticketing kiosk experiencing system slowdowns. Upon opening the chassis, the technician observes that the motherboard utilizes smaller memory expansion slots designed for space-constrained hardware rather than standard full-length desktop slots. Which memory module form factor must the technician select to perform a hardware upgrade on this system?
A desktop support technician is troubleshooting a high-volume color inkjet printer that is producing output with evenly spaced horizontal blank lines across printed images and text. The ink level indicator shows that all ink cartridges are more than half full. Which of the following maintenance steps should the technician perform first to resolve this print defect?
A desktop technician is upgrading a workstation by installing a dedicated PCIe x16 graphics card with a peak draw of and a PCIe x4 multi-port capture card rated at . The host CPU requires , while remaining peripherals consume . Which of the following technical precautions and installation requirements must be met to ensure hardware compatibility and stable power delivery? (Select TWO.)
Geçerli olan tümünü seçin
A technician is setting up a desktop workstation for video editing. The motherboard features one primary PCIe x16 expansion slot wired electrically at x16 and a secondary full-length PCIe x16 expansion slot wired electrically at x4. The technician installs a dual-slot PCIe x16 graphics card in the primary slot. Which of the following components can be installed into the secondary expansion slot without encountering physical keying or mechanical fit issues?
A desktop support technician is connecting a workstation's graphics card featuring a DisplayPort output to an older high-resolution monitor that only accepts a Dual-Link DVI-D input. The technician uses a standard passive DisplayPort-to-DVI adapter cable. While the monitor powers on and displays an image, the maximum available resolution in the operating system is limited to , failing to reach the monitor's native resolution. Which of the following is the primary cause of this resolution limitation?
A systems technician is configuring hardware components for laptop, desktop, and server deployments. Match each RAM form factor or technical specification on the left with its primary physical characteristic or operational requirement on the right.
Soldaki öğeye tıklayın, sonra eşleşen sağdaki öğeye tıklayın
Öğeler
Eşleşmeler
An IT technician is performing scheduled preventive maintenance on a high-volume departmental electrophotographic (EP) laser printer after reaching its specified page count threshold. Which of the following components are typically included in a standard laser printer maintenance kit and should be replaced during this procedure? (Select TWO.)
Geçerli olan tümünü seçin
A technician is preparing specs for several custom PC builds requiring specific motherboard form factors and power configurations. Match each motherboard form factor or connector on the left with its corresponding physical dimension or functional specification on the right.
Soldaki öğeye tıklayın, sonra eşleşen sağdaki öğeye tıklayın
Öğeler
Eşleşmeler
A technician is installing a dedicated PCIe expansion card with a total rated power draw of . The motherboard slot delivers up to through the PCIe bus. Which auxiliary power connection must be connected from the power supply unit (PSU) to fulfill the expansion card's remaining power requirement?
A desktop motherboard features four memory slots labeled DIMM_A1, DIMM_A2, DIMM_B1, and DIMM_B2, where slots labeled 'A' belong to Memory Channel A and slots labeled 'B' belong to Memory Channel B. A single module is currently installed in slot DIMM_A1. To achieve dual-channel throughput when adding a second identical module, into which slot should the new RAM module be installed?
A helpdesk technician is dispatched to inspect a office laser printer that produces output pages with solid black sheets across the entire printable area on every document. Which electrophotographic (EP) printing component has most likely failed or lost its primary electrical charge?