Hardware
445 soru
Match each display cable or connector standard on the left with its defining physical or operational characteristic on the right.
Soldaki öğeye tıklayın, sonra eşleşen sağdaki öğeye tıklayın
Öğeler
Eşleşmeler
Match each printer technology on the left with its primary maintenance consumable or key replacement component on the right.
Soldaki öğeye tıklayın, sonra eşleşen sağdaki öğeye tıklayın
Öğeler
Eşleşmeler
Match each expansion card slot or power supply connector to its primary specification and functional role within a PC build.
Soldaki öğeye tıklayın, sonra eşleşen sağdaki öğeye tıklayın
Öğeler
Eşleşmeler
A field technician is preparing memory hardware for two different system deployments: a compact executive laptop and a standard tower workstation. The technician needs to verify form factor compatibility and dual-channel configuration rules prior to installation. Which of the following statements regarding memory module physical specifications and channel population rules are correct? Select TWO.
Geçerli olan tümünü seçin
A system administrator notices that a departmental printer regularly pulls several sheets of paper at once from the main tray, causing frequent jams near the intake path. The paper weight and tray guide settings have already been verified as correct. Which of the following components should be replaced to resolve this issue?
A technician is installing a replacement motherboard into a workstation case and preparing the system for first boot. Which of the following motherboard power connections must be secured to ensure the system board and processor receive proper power? (Select TWO.)
Geçerli olan tümünü seçin
A technician is upgrading a desktop workstation used for video editing. The motherboard specifications state that it requires DDR4 Unbuffered DIMMs (UDIMMs). The technician attempts to install two 16 GB DDR4 Registered DIMM (RDIMM) modules retrieved from a retired enterprise server. Upon powering on the workstation, system fans turn on, but the computer fails to POST and displays no video output. Which of the following best explains why the system failed to boot?
A desktop technician is sizing a power supply unit (PSU) for a 3D modeling workstation upgrade. The system features a CPU rated at TDP, a new workstation graphics card with a peak power consumption of , and internal peripherals (motherboard, RAM, liquid cooler, and storage drives) drawing a combined total of . Company policy mandates that the total estimated system power consumption must include an additional safety headroom margin to ensure long-term stability and prevent PSU overload. What minimum PSU wattage capacity should the technician select for this workstation?
An IT technician is configuring a dual-monitor workstation using a laptop equipped with a single USB Type-C port that supports DisplayPort Alternate Mode (DP Alt Mode), but lacks Thunderbolt certification. The technician intends to connect two 1080p external displays by daisy-chaining them using DisplayPort Multi-Stream Transport (MST). Which of the following requirements or features are necessary to successfully support this configuration? (Select TWO.)
Geçerli olan tümünü seçin
A field technician is auditing memory inventory for an upcoming hardware refresh across desktop workstations, portable devices, and network servers. Match each physical memory specification or characteristic on the left to its corresponding RAM type on the right.
Soldaki öğeye tıklayın, sonra eşleşen sağdaki öğeye tıklayın
Öğeler
Eşleşmeler
A technician is building a compact desktop PC for a client using a standard Mini-ITX motherboard. The client requests that the build include both a dedicated dual-slot PCIe x16 graphics card and a separate PCIe x4 Wi-Fi adapter card. Which of the following physical characteristics of the Mini-ITX form factor will prevent the technician from fulfilling the client's request?
An IT technician is reviewing the internal electrophotographic (EP) printing cycle to troubleshoot a laser printer image quality issue. Place the following primary steps of the EP laser printing process in the correct chronological order from first to last.
Öğeleri doğru sıraya koymak için sürükleyin
A field technician is assembling a custom audio/video workstation. The system components have the following peak power requirements:
- Processor (CPU):
- Dedicated Graphics Card (GPU):
- PCIe Video Capture Card:
- Motherboard, RAM, and cooling system:
- Storage drives:
To ensure stable operation and longevity, company policy specifies that the total power draw of all components must not exceed of the power supply unit's (PSU) rated continuous capacity.
What is the minimum rated capacity, in Watts (), required for the power supply unit?
A field technician is servicing a compact mobile laptop for a remote employee. Upon inspecting the system board, the technician notes that the motherboard requires a 260-pin memory module engineered specifically for space-constrained laptop enclosures. Which memory module form factor should the technician select for this installation?
A desktop technician is deploying a dual-display workstation using a graphics card equipped with one DVI-I port and one DVI-D port. The technician attempts to connect two analog VGA monitors using identical passive DVI-to-VGA adapters. The monitor connected to the DVI-I port displays video correctly, but the monitor connected to the DVI-D port displays no signal. Which of the following best explains why the second monitor fails to display video?
A technician is installing motherboard power cables and chassis front-panel header connections during a custom workstation assembly. Match each motherboard connector or header to its primary function or operational characteristic.
Soldaki öğeye tıklayın, sonra eşleşen sağdaki öğeye tıklayın
Öğeler
Eşleşmeler
An IT technician is specifying a replacement power supply unit (PSU) for a CAD workstation upgrade. The system components have the following rated maximum power requirements: CPU at , graphics card at , and remaining motherboard components, storage drives, and cooling fans at combined. To ensure operational stability and system longevity, company policy requires a minimum power safety headroom margin of above the total peak power draw. Which of the following is the minimum power supply wattage rating the technician should select to meet this requirement?
An IT support technician is troubleshooting a departmental laser printer that produces output pages with extremely faint text and images across the entire sheet. Replacing the toner cartridge with a new manufacturer-approved unit does not resolve the issue. Diagnostic tests confirm that the fuser assembly is reaching full operating temperature and the imaging drum is taking a uniform charge. Which of the following components is most likely defective and failing to draw toner from the imaging drum onto the paper?
An IT technician is organizing cable inventory for client workstation deployments. Match each display connector standard on the left with its defining physical or operational characteristic on the right.
Soldaki öğeye tıklayın, sonra eşleşen sağdaki öğeye tıklayın
Öğeler
Eşleşmeler
A technician is performing a memory upgrade on a desktop workstation motherboard that features four physical memory expansion slots labeled Slot 1 through Slot 4 across two memory channels. The technician has two identical DDR4 RAM modules to install. Which of the following steps and specifications must the technician follow to complete the installation correctly? (Select TWO.)
Geçerli olan tümünü seçin